[1]高岩.参数化设计——更高效的设计技术和方法[J].世界建筑,2008(5):28-33.
[2]Eastman, Charles; Fisher, David; Lafue, Gilles; Lividini, Joseph; Stoker, Douglas; Yessios, Christos (September 1974). An Outline of the Building Descripiton System. Institute of Physical Planning, Carnegie-Mellon University.
[3] Van Nederveen, G.A.; Tolman, F.P. (1992). "Modelling multiple views on buildings". Automation in Construction 1 (3): 215–24..
[4]Autodesk (2003). Building Information Modeling. San Rafael, CA, Autodesk, Inc.
[5]http://en.wikipedia.org/wiki/Building_information_modeling
[6]http://en.wikipedia.org/wiki/Design
http://zh.wikipedia.org/wiki/%E5%BB%BA%E7%AF%89%E8%A8%AD%E8%A8%88
[7]高岩.质疑数字化(建筑)设计——浅谈数字化“与”建筑设计[J].建筑技艺,2014(5).
[8]Van Nederveen, G.A.; Tolman, F.P. (1992). Modelling multiple views on buildings. Automation in Construction 1 (3): 215–24..
[9] Patrik Schumacher,The Autopoisis of Architecture, 2012.